Client: ALCOA Inc., Dover, NJ
|
Client: ALCOA Howmet Construction Value: $ 1.5 Million Scope of Work: Design upgrade of HVAC System in Monoshell & Tunnel Area Design Start: 2006 Design Complete: 2007 Construction Complete: 2007 |
DS Facility Upgrade HVAC System in Monoshell & Tunnel AreaALCOA Howmet Castings Facility in Dover, New Jersey manufactures various components for the aircraft engine and industrial gas turbine industries and other non-traditional castings using the investment casting technology.In the D.S. Facility, a mold is made by making pattern using wax for casting. The existing HVAC system serving the Monoshell Dipping and the Tunnel areas were not able to maintain the required temperature and humidity. This affected the quality of mold and end product. A&J Consulting performed engineering evaluation of the existing facility and discovered that existing system was not adequate to maintain required temperature and humidity. A&J designed Upgrade of existing HVAC systems serving the Monoshell Dipping and the Dry-box Tunnel areas in the D.S. Facility. |
Home|Careers|Contact|Privacy Policy|info@anjengineer.com |
© A&J Consulting Engineering Services, P.C. 164 Brighton Road, Clifton, NJ 07012 Tel: (973) 777-9696 Fax: (973) 777-5528 |